Mr. Roggie started installing the kitchen and my jaw dropped when I saw it. The pictures don't even do it justice, it looks flipping awesome. He comes back today to install the upper cabinets.
Leah loves her new purple room.
The island is starting to take shape.
The hardwood floors are progressing.
They installed the window on the peak.
Siding is 90% complete. All that is left is the front porch.
There will be stone on the bump out, thus why it isn't sided.
No comments:
Post a Comment